From: route@monster.com
Sent: Friday, September 30, 2016 12:48 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: CCVP SIP Cloud
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Confidential, MCITP, MCSE, CCNA, ITIL, ITAR E-mail: 4229tech@gmail.com Plano, Texas 75093 SKYpe/Virtualization/Office 365 Engineer- architect Microsoft UC
Engineer with several years of fortune 500 enterprise experience with all
versions of Microsoft Unified Communications products (Lync (2010, 2013),
Office Communication Server (RTM, R2) and Live Communication Server
(LCS). Additional background with Windows Server (2000, 2003, 2008,
2012), Cisco routers and switches. Expert experience with Active Directory,
Exchange, SQL, virtualization (Hyper-V, VMware) in enterprise environments.
Additional experience with Office 365, BPOS-S and BPOS-D deployments.
Exceptional customer facing and technical project management skills in
enterprise environments. Experience in high-tech, defense, restaurant,
hospitality, insurance, finance, payment card, health care, and aircraft
industries. Interim C6 clearance. Certifications
Courses
Professional Experience Fortune 50 Consulting Company Infrastructure Architect/Engineer – Microsoft /
VMware2014 - Present Project Listing Canadian Financial Enterprise Organization Exchange / VMware SME As an Exchange / VMware Architect, provided the
discovery health assessment review to evaluate the current state of an in
process migration of Exchange 2010 to Exchange 2013 within a virtualized
(VMware) environment. As the Exchange / VMware Consultant on the
engagement I lead in the following: ·
Discovery of
the current status of the Exchange 2013 migration in process ·
Evaluation of
the existing VMware environment, remediated misconfigurations · Exchange server sizing and deployment within a production
and DR environments · Participated in daily trouble shooting calls, and
remediation · Produced Gap documentation with remediation
recommendations, that was presented to project stakeholders Large System Integrator Lync 2013 SME As a Lync 2013 Architect, provided the discovery
and prior migration assessment to evaluate the current state of an incomplete
migration of Lync 2010 to Lync 2013 (Enterprise edition). As the
UC Consultant on the engagement I lead in the following: ·
Discovery and
resolution of incomplete Lync 2013 migration tasks (based on PowerShell
tools) ·
Discovery and
removal of redundant enterprise voice components; validation of enterprise
voice deployment ·
Discovery and
removal of LCS (Live Communication Server), OCS (Office Communication
Server), Lync 2010 and 2013 Active Directory Organizational Units and service
accounts as needed ·
Build,
deployment documentation and reporting of existing Lync 2013 deployment and
migration details ·
Optimized Lync
Enterprise Voice configuration ·
Microsoft
components: Active Directory, DNS Ohio Engine Manufacturer Lync 2013 SME As a Lync 2013 Architect provided guidance and
logistics in deployment of several enterprise Proof of Concept (POC) labs.
Lync Enterprise 2013 – Cisco Call Manager and Acano conferencing solution
integration with SIP trunks. As the UC Consultant on the engagement I lead in
the following: · Schema, Forest, Domain object installation, configuration,
troubleshooting and documentation (based on PowerShell and other tools) · Team coordination, project management and Lync 2013 build
/ design documentation · Lync test design and communication strategy · Documentation of Lync 2013 troubleshooting, and
remediation · Future state strategy and recommendations · Microsoft components: Active Directory, DNS, Certificate
Services · Liaison with ATT Hosting solutions in deployment of
enterprise voice. Other workloads include: IM. Presence, Desktop
Sharing, Web Conferencing, P to P voice · POC deployment of Skype for Business · Deployment of SIP Trunks for Enterprise Voice Large International Utility Wintel - Virtualization SME As the lead virtualization consultant focused on
VMware host and guest deployment that was critical to a new data center
migration for a North American Utility. Compiled requirements
configured and deployed ESX hosts and guest machines on HP blade servers for
a data center migration project. Met short deadline tasks, kept project
migration on schedule. Compiled and presented design, build
documentation to stakeholders. Participated in after-hours work as required. · Attached Hitachi LUNs to VMware guest machines, installed
HDS supporting software, attached additional LUNs are required · Conducted V to V and P to V migrations using VMware
Converter and V-Motion, reconstruction (and certification) of guest machines
after migrations (as required) · Prepared physical machines for physical migration to
mitigate transportation issues (P to P) · Installed VMware Clustering for HA, DRS · Setup and configured new guest 2012 R2 Domain Controllers
(Active Directory), DNS, OU’s. GPO’s on ESX hosts · Setup and configured trusts, synchronization with existing
domain · Configured and installed additional guest machines,
backup, user authentication, joined to the new enterprise domain. · Constructed and presented project design and build
documentations in client presentations Large International Oil and Gas Organization Wintel – AD Migration SME Part of a team migrating subsidiary from parent
AD forest. Responsible for using command line and PowerShell scripts to
migrate AD and user objects to subsidiary forest. Migrated, and tested
GPO’s and OU’s and other AD objects. Architected, deployed 2012 R2
domain controllers within a virtualized environment for deployment within the
Softlayer cloud. Cloud Managed Storage Services (CMSS) Virtualization Architect Sole architect and deployment of VMware ESX Host
and vCenter Servers for an internal IBM project. Made design,
deployment and configuration recommendations to project stakeholders.
Phase I and phase II deployment. · Presented HA and DR plan to data center stakeholders · Implemented, tested and verified HA and DR ESX clustered
environment · Installed and configured ESX host servers with LUN storage · Customized configuration for vCenter and ESX hosts for
DNS, domain (AD) authentication, NTP, user permissions · Designed and deployed VMware Clusters for high
availability and fault tolerance · Installed and configured Domain Controllers (with DNS and
Active Directory), vCenter Server, and member servers. Troubleshooted
VMware deployment, remediated various network and infrastructure issues · Conducted Windows server upgrades (2003 to 2008) within
VMware 4.0 environment in preparation for migration · Configuration and deployment of customized SNMP traps to
integrate with IBM’s Netcool product. Refined traps to meet customer’s
requirements · Upgraded vCenter servers from version 5.1 to version 5.5,
established Link Mode between two data centers Large Northeast Financial Company Microsoft Platform Architect As Microsoft lead consultant conducted extensive
Active Directory (AD) discovery and health assessment in regard to issues
that were caused by corporate mergers and acquisitions. Made written
recommendations for remediation of present state AD issues and scalability to
future state. Designed and presented findings to corporate executives. Big Three Auto Maker Wintel - SME Project team member focused reverse cloud
migration from Office 365 to on premise environment. Direct interface
with customer on task status and task completion. · Interface with international team members. · Discovery, diagnosis of severity and remediation of the
following issues (with documentation): Active Directory server monitoring,
server and user auditing, SCP, enterprise server patch management AT&T 2012-2014 UC Consultant Microsoft UC SME for on-site and remote
deployment of Enterprise Lync Wave 14 (2010) and Wave 15 (2013).
Presentations to executives and stakeholders as required. Technical
architectural design documents, project plans and knowledge transfer to
customers required. Pre-Sales: SOW (Statement of
Work) RFI, RFP responses. Customer kick-off meetings, workshop
presentations, Strategy and Roadmap documentation, gap analysis with RACI
matrix. Financial analysis (TCO, ROI) according to project (see below
for details). Post-Sales: Design
documentation, deployment documentation, configuration, implementation,
troubleshooting, testing and certification (see below for details). §
Sole engineer
in charge of company’s Professional Services Lync-SI (TAP) program
requirements for Lync (Wave 15) Beta-1 refresh, Beta-2 and RTM
versions. Along with supporting documentation and scripting as
required. §
Installations
of Lync (2013) Wave 15 RTM, Exchange 15 (2013), WAC, SCOM servers, Exchange
UM and enterprise voice. §
Enterprise Lync
deployments conducted on 2008 R2 and 2012 R2 servers with Active Directory,
Certificate Services, DNS and DHCP §
Installations
of Lync Wave 15 (Beta 1 refresh, Beta 2) for Fortune 100 customer on Windows
2008 R2 server with Active Directory, DNS, DMZ server integration §
Strategy and RoadMap
strategic studies that include Avaya, Cisco, Lync UC vendor comparisons with
deliverable documentation, TCO (Total Cost of Ownership) and other financial
analyses §
Lync 2010
migration to Lync 2013 §
Detailed health
and readiness assessment studies with recommendations for enterprise voice,
Office 365 integration and Acme Packet / Audiocodes SBC §
Microsoft
Server 2012 deployment with Hyper-V, AD DS, and SCSI storage §
Deployment and
configuration of Cisco UCS 6248 UP and Cisco 5108 blade chassis with B200,
B250 and B440 Cisco blade servers using Hyper-V and VMware for AT&T’s
Center of Excellence Lab, Richardson, Texas. §
Polycom RMX,
HDX setup and deployment with integration to SIP/IP hardphones (Nortel 8540,
Polycom CX300, CX500, CX 600, VVX 500; SNOM 821, 710, 720, 760, 870) §
Protocols: TCP, UDP, IP, MTLS, TLS, SIP, STUN, TURN, RTP, DNS, VoIP,
SMTP, IMAP4 §
Applications: Server 2003 32 & 64 Bits; Server 2008 (R1, R2) 2012;
ISA / TMG (Forefront Threat Management Gateway), Hyper-V; Vmware, Office
2010; Office Communicator (versions 2005, 2007, Lync 2010, 2013); Visio 2010;
Live Meeting; Network Monitor; Office Communication Server (2007 RTM, R2,
Lync (2010, 2013 - Standard and Enterprise); IIS(7), Certificate Services,
MGPM, SQL Server (2005, 2008, 2012), SCCM (System Center Configuration
Manager) Windows 7, Vsphere, AudioCodes Gateways, Wireshark Slalom Consulting 2011-2012 Solution Architect Customer facing, pre-sales and on site and remote
deployment of BPOS-S, Office 365 cloud products for Microsoft Gold
Partner. Deployment of Lync Server (OCS Wave 14). Develop
customer requirements, designing deployments and migrations as
required. Project management technical design documents, roll out
plans, and support programs for help desks as required. Sharepoint
deployment and administration as required. § OCS to Office 365 cloud federation / migration § BPOS-S deployment with Office Communicator Online and web
based Live Meeting § Lync deployments with various configurations /
functionality (as well as HA/DR deployments) § Exchange 2003 migration to Exchange Office 365 § Windows 2008 R2 component services: Active Directory, DNS,
DHCP, Network Load Balancing, IIS, Hyper-V, Certificate Services, ADFS,
DirSync, Powershell § Customer server health checks, network assessments as
required § Virtualization: Hyper-V and VMware § Unified Communications and Roadmap study for major bread
company with Solution Alternatives § Lync Wave 15 Beta 1 refresh lab POC §
Protocols: TCP,
UDP, IP, MTLS, TLS, SIP, STUN, TURN, RTP, DNS, VoIP, SMTP, IMAP4 §
Applications:
Server 2003 32 & 64 Bits; Server 2008 (R1, R2), ISA / TMG (Forefront
Threat Management Gateway), Hyper-V; Office 2007; Office Communicator
(versions 2005, 2007, Lync); Visio 2007; Live Meeting; Network Monitor;
Office Communication Server (2007 RTM, R2, Lync, Standard and Enterprise);
IIS(7), Certificate Services, MGPM, SQL Server (2005, 2008), Windows 7,
Vsphere, AudioCodes Gateways, Wireshark Azaleos Corporation 2010-2011 Enterprise Consultant Customer facing, on
site and remote deployment of Office Communication Server 2007 (R2 & R1;
enterprise and standard editions) for Azaleos and Microsoft Enterprise
Clients (V-Dash consultant). Deployment of Lync Server (OCS Wave 14).
Develop customer requirements and architecting deployments and migrations as
required §
Migration of Microsoft Enterprise customers to Microsoft Online
Services (BPOS-D / Cloud) for Microsoft Online Services (MOS). Roles
include: Project Manager (PM) and Deployment Consultant Manager (DCM) §
On premise migrations of enterprise customers from LCS to OCS 2007
R2; from LCS to Lync Server §
Heavy use of Windows server components and tools including: Active
Directory, DNS, Certificate Services, IIS, NetMon, Validation Tools, windows
command line utilities §
Enterprise installations of Windows 2008 (R1, R2) Enterprise with
IIS 7, Certificate Services and Hyper-V deployments, Exchange 2010, SQL 2008 § Project management (work package design, etc.) SME duties,
backup solutions and documentation as required § Sales engineer services and customer support as required § Application deployments include Exchange 2010, SQL 2008,
BES on 2008 R2 servers § Applications: Vista; Server 2003 32 & 64 Bit; Server
2008 (R1, R2), ISA / TMG (Forefront Threat Management Gateway), Hyper-V;
Office 2007; Office Communicator (versions 2005, 2007); Visio 2007; Live
Meeting; BES, Sharepoint, Network monitor; Live Communication Server 2005;
Office Communication Server (2007 R1 R2, Lync, Standard and Enterprise); IIS,
Certificate Services, SQL Server (2005, 2008);Windows 7; Vsphere, Wireshark;
NetMon § Hardware: F5, Cisco hardware load balancers (HLB);
firewalls § Protocols: TCP, UDP, IP, MTLS, TLS, SIP, STUN, TURN, RTP,
DNS, VoIP, SMTP, IMAP4 Comsys2009-2010 Microsoft Corp, Irving, Texas Unified Communications Support Engineer §
Designed, configured, troubleshooted and deployed virtual Live
Communication Server 2005, Office Communication Server 2007 (R2 & R1;
Enterprise and Standard Editions ) for Microsoft Enterprise Clients §
Heavy use of Windows server components and tools including: Active
Directory, DNS, Certificate Services, IIS, NetMon, Validation Tools, Snooper,
Route Helper, voice troubleshooting tools, windows command line utilities §
Assisted customers with Live Communication Server (LCS) and Office
Communication Server (OCS) architecture migrations from LCS to OCS,
integration of OCS with Exchange Server Unified Messaging (2007, 2010) §
Recent focus on Windows 2008 Enterprise with IIS 7, Certificate
Services and Hyper-V deployments §
Extensive troubleshooting, network analysis, firewall analysis,
bandwidth analysis, with NetMon and Wireshark §
Office Communication Server integration with Cisco Unified
Communications Manager §
Migration of LCS 2005 and OCS 2007 RTM deployments to OCS 2007 R2 § Applications: Vista; Server 2003 32 & 64 Bit; Server
2008; ISA server, Hyper-V; Office 2007; Office Communicator (versions 2005,
2007); Visio 2007; Live Meeting; Network monitor; Live Communication Server
2005; Office Communication Server (2007 R1 R2, Standard and Enterprise);
Exchange Server; SQL server; Clarify; MSSolve; Windows 7; Wireshark; NetMon § Hardware: F5, Cisco hardware load balancers (HLB);
firewalls, Tanjay phones § Protocols: TCP, UDP, IP, MTLS, TLS, SIP, STUN, TURN, RTP,
DNS, VoIP, SMTP, IMAP4 4 Ocean Systems2008-2009 Perot Systems, Plano, Texas Senior Systems INTEL SPECIALIST §
Designed,
configured, troubleshooted and deployed virtual server lab (VMware), with
Windows 2003 R2 domain controller and Vista clients to test and troubleshoot
new application (concurrent logons) effecting major Perot Client.
Reported and documented deployment steps for project manager with network
design maps §
Windows 2000
server builds with terminal services deployment, patch management, service
pack upgrades §
Participated in
project team meetings with upper management, assisted in designing a rollout
schedule with testing methodology for final client certification and
approval. Configured production servers for final release. §
Verified,
trouble shooted TCP/IP, DHCP and DNS configurations for production servers §
Advanced,
customized scripting of *.conf files for lab and customer
configurations §
Cisco 1721
router deployment, 2924 XL switch deployment, IOS upgrade and backup (TFTP),
VPN configuration, VLAN installation §
Software: Visio
2007, MS Project, IIS, UserLock, Virtual Center 1.0.4;
1.0.5;VMware-Converter, SysPrep, Windows 2003 (R2), Microsoft Office
Communication Server R1,Centos 5.2 (Apache, VNC, Samba, Sendmail) Splunk §
Hardware: Dell
2950, HP DL360, DL380 G5, Cisco 1721, Cisco 2924 XL, MacBook Pro Midcom Corporation2008-2008 Raytheon professional services Company (RPC), Garland, Texas RPS IT Internal Controls Manager §
Management of
General Computing Controls (GCC) audit / Critical Controls Review (CCR) for
Garland, Texas, Columbus, Ohio and Reusselsheim, Germany sites with Raytheon
finance, external auditors, and IT departments §
Direct duties
included stakeholder interviews, validation of control test results,
observations, mitigation of issues, identification and deployment of best
practices, and development of additional action plans Raytheon Corporation, 2007-2008 Enterprise Service Integration (EsI), Garland, Texas Technical Project Manager §
Project
management of simultaneous, multiple Raytheon enterprise projects.
Duties included scope definition, risk evaluation, budget management, project
team formation, ordering CPE (Cisco routers, VAGs and switches) and circuits,
meeting critical deadlines and milestones, validation of build of materials
(BOM), capacity planning and evaluation. Responsible for remediation of
project issues and escalations. Management of project teams which
included 3-10 personnel. Projects stakeholders included internal,
external customers and vendors, domestic and international, budget range:
$30,000 to $3.5 million §
Asset
management for required project hardware, tracking of purchased hardware;
proper ordering, configuration, delivery and installation. Exchange of
end of life hardware for current manufactured supported hardware §
Conducted regular meetings with customized reports and
presentations to stakeholders, supply chain §
Led capacity management project concerning data center relocation
from Long Beach, CA to Hartford, CT effecting 300 servers §
Projects implemented with consideration of the Software
Development Lifecycle, pertaining to COTS packages §
Led
infrastructure connectivity project, a segment of the $11.2 billion Army
Warfighter FOCUS Program, part of the Warrior Training Alliance (WTA). In
partnership with Computer Sciences Corporation (CSC) and General Dynamics
Information Technology. §
Led $450K
project that provided disaster recovery connectivity (DS3) to a main Raytheon
facility in partnership with vendors CSC and AT&T. Coordinated
Raytheon and AT&T construction, fiber pull, circuit test, demarc
installation, quality presentation(s) and certification(s) §
Certified
Raytheon Information Security Administrator (RISA) §
Software: Lotus
Notes, Visio 2003, MS Project 2003, Sharepoint, Nessus, internal applications §
Hardware: Cisco
1711, 1811, 3745, 2811 HLP Solutions2006-2007 Alliance Data Systems, Corporate Command
Center / IT Solutions, Richardson, Texas network engineer / IT Auditor §
PCI (Payment Card Industry) IT Audit - compliance, remediation,
security §
SOX IT Audit, compliance, documentation, reporting, remediation,
communications with upper management §
Conducted
server hardening on selected servers in order to control server access.
Secured Servers by disabling user access, services and protocols in
compliance with audit controls. Audited, evaluated and verified
enterprise server backups. Extensive discovery of network servers,
applications (PGP, Clean Access, Exchange) policies and procedures (System
Software Modifications, Change Control). Heavy utilization of command line
utilities. Interviewed server OS and application “owners”. Interdepartmental
communications with several areas including change control Signature Consulting2006-2006 General Dynamics / Satcom Technologies, Richardson, Texas network engineer §
Managed local
Vertex RSI and Satcom Technologies site: desktops, laptops, printers,
servers, provided solutions for help desk tickets. Regular meetings
with department heads to qualify business process requirements, regular
interface with vendors to facilitate business process software upgrades and
purchases §
Catalyst 6504
setup and configuration §
Rebuilt central
office administration points on network application server §
Built new
Veritas backup solution (Backup Exec) §
Implementations:
Team Track (ADL application), Inventor 10, Vault 4, PADS (Mentor Graphics),
Symantec Enterprise Vault, Backup Exec, Microsoft Applications §
Ghosted Toshiba
laptops for local deployment using new Ghost image Incisive Information, Dallas, Texas (Selected, past engagements) 2000-2005 radomes, Dallas, Texas IT
Manager §
Solely
accountable for 100 node commercial class LAN and WAN connections.
Increased uptime by 20% through network infrastructure optimization.
Regular contact with telecom vendors for WAN upgrade (DSL / T1) §
Developed
Request for Proposals (RFPs) for new servers and desktops, evaluated RFPs
from the manufacturers. Responsible for recommending and purchasing all
new hardware and software (IBM & Dell) §
Re-designed the
nightly back up (EMC Retrospect 7.0 software) for all servers and clients §
Re-designed the
Anti-Virus (Symantec) solution for servers and clients §
Acted is the
daily Network/MS Exchange 5.5 Administrator for clients, migration of
Exchange 5.5 to 2003 §
Application
support: Outlook, MAS 200, ACT!, Winfax Pro, Access, HourTrack Education Whiffltetree X - Home Owners Association President 2010-Present Bachelor of Arts, State University Of New York ITIL Foundations Life Guard
Rye Playland, NY
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|